HORIZONTAL FORMWORKS03
1. BAJAJ Quick Strip / Metriform Drop-Head Slab System
Early striking is a technique whereby the formwork is removed 3 to 4 days after pouring a slab, but the supporting structure of scaffolding or props remains undisturbed until the concrete is strong enough to support its own weight over its full span.